Project goal: The lighting and air conditioning of the guest house and the treatment center, the implementation of educational measures using audio-visual means, the cooling of medicines and food and the functionality of the administration should be ensured. Measures: During a construction project in 2017, a latrine building was completed, which was already built in such a way that the construction and orientation of the roof can be used to operate a solar system. A room accessible from the outside is intended to accommodate solar technology and energy storage. A photovoltaic system is planned that will cover the needs of the existing buildings and work. The project also includes the electrical cables and the end devices (lamps, fans, cooling devices).
*** Description by project sponsor ***